Site Plan
Overall site plan coordinating property line setbacks, vehicular access drives, septic field setbacks, building envelope boundaries, and structural wall footprints on a 2.57-acre parcel. Highlights regulatory zoning compliance, fire access turnarounds, and site-wide spatial organization.
Grading & Hardscape Layout Plan
Technical layout map interfacing residential architecture with steep native topography. Establishes finished pad elevations, retaining wall alignments, pool vessel placement, and contour grading to manage surface runoff around existing slope edges.
Structural Site Sections & Pool Surcharge Analysis
Detailed cross-sections (S1–S6) demonstrating cut-and-fill balancing, multi-tiered terracing, and structural slope stabilization. Features a 45-degree pool surcharge influence line analysis to ensure structural independence between the pool shell and downhill CMU retaining footings.
CMU Retaining Wall Details & Structural Specifications
Construction details specifying reinforced CMU block assemblies ranging from 0'-2" to 6'-8" in height. Includes rebar sizing schedules (#4 and #5 bars), continuous concrete footings, backfill drainage rock with perforated pipe, and code-compliant 42-inch safety guardrail integration.